Project Information
Duration: 7 Months
Team Composition:
1 Project Leader
2 Software Developement Engineer
1 Quality Assurance Engineer
Project Description
The Budget, Schedule and Document Management System were developed to have an easier time monitoring the resources of JICA Philippines Office. These Database were specific to the requirements of JICA.
Project Coverage
- Desing, Development & QA Testing
- Hardware and Software Requirements Setup and Configuration
- Development of User’s Manual
- User Training on site
- Design Enhancement
Technologies Used
- Lotus Notes/Domino R6
- MacOS 9