JICA / Budget, Schedule and Document Management System using Lotus Notes

Projects_SI_2

Project Information

Duration: 7 Months
Team Composition:
1 Project Leader
2 Software Developement Engineer
1 Quality Assurance Engineer

Project Description

The Budget, Schedule and Document Management System were developed to have an easier time monitoring the resources of JICA Philippines Office. These Database were specific to the requirements of JICA.

Project Coverage

  • Desing, Development & QA Testing
  • Hardware and Software Requirements Setup and Configuration
  • Development of User’s Manual
  • User Training on site
  • Design Enhancement

Technologies Used

  • Lotus Notes/Domino R6
  • MacOS 9