IBM Japan / Test Management System (TEMS) using Lotus Notes

Projects_SI_1

Project Information

Duration: 6 Months
Team Composition:
1 Project Leader
4 Software Developement Engineer
1 Quality Assurance Engineer

Project Description

The Test Management System (TEMS) was designed to automate project/test planning and test result/problem reporting of the different phases of the quality assurance for Portable Systems Group in IBM Japan.

Project Coverage

  • Design Development & QA Testing
  • Hardware and Software Requirements Setup and Configuration
  • Development of User’s Manual
  • 3 Day Users Training at IBM Japan
  • Design Enhancement

Technologies Used

  • Lotus Notes/Domino R5
  • JAVA
  • Windows 2000 Server